The Stanley Hall Collection©.
Tulloch Limited Rhodes N.S.W. (Page 1 of 3)
The following collection of photographs was taken from the Stanley Hall Collection© and covers some aspects of the railway rolling stock and associated work carried out by Tulloch Limited during the mide 20th century. The Stanley Hall Collection© retains the copyright and photographs may not be reproduced or re-transmitted in electronic format without the express permission of the custodian of the Stanley Hall Collection© (Rick Fletcher). The photographs are provided for the interest and private use of historians, railway modellers and enthusiasts. Captions and dates shown in italics were taken from the original source
Rick Fletcher (may be contacted through    )
PAGE 1    PAGE 2     PAGE 3
CLICK IMAGE TO VIEW FULL SIZE


2

3
Tulloch Limited factory at Rhodes (circa 1950s) 2BJ Bogie ready for use.
 
4
 
5
 
6
10000 Gal rail tank car - tank test date shows 22-11-1950. Standard gauge. Coded 284 & 285
Sign reads -
NO HAND
BRAKE
DO NOT RELEASE
COUPLING
10000 Gal Atlantic rail tank car - tank test date possibly 1952 (unclear)
Standard gauge. Coded A.U.O 79
Sign at RH end reads "ALANTIC UNION OIL Co Ltd" with the "o" and the "td" small superscript block capitals with an underscore. duration.
5000 Gal Atlantic rail tank wagon
(see below)
CLICK IMAGE TO VIEW FULL SIZE

7

8
 
9
5000 Gal Atlantic "rail tank wagon complete with bogies ready for despatch from Tulloch's siding to Clapham Junction, Queensland, for operation on Queensland Railway system."
Tank test date 27-4-51.     Narrow gauge (3'6")    Coded AUO No. 64. Loaded on a Well Wagon.

10
 
11
 
12
15/10/1951
50-Ton Ballast Wagon - 3 Door Bottom Discharge.
Bogie Ballast wagon for South Portland Cement Company (circa 1960) A SHELL Bitumen tanker under construction
CLICK IMAGE TO VIEW FULL SIZE

13
 
14
 
15
A SHELL Bitumen tanker under construction. A SHELL Bitumen tanker under construction. Is it being lagged with asbestos? A SHELL Bitumen tanker completed.

16

17

18
1951
Interior view of one section of the Boiler Shop showing all steel Suburban Electric Carriages, 10,000 gallon rail car tanks, dished and flanged ends for the tanks and underframes in the course of manufacture.
1951
More detail of the assembly line of all steel Suburban Electric Carriages.
CLICK IMAGE TO VIEW FULL SIZE

19

20

21
Interior view of the machine shop. Suburban Electric Carriages in the paint shop.

22

23

24
10000 Gal COR rail tank wagons
tank test date undated. Standard gauge
Coded C.O.R 371, 379, possibly 380 and unknown. Circa 1951
Suburban Electric Driving car C3504 ready for delivery. An HFH ready for delivery.
PAGE 1    PAGE 2     PAGE 3